Mongrel Boots

New Boot Making Machine in Sydney

Mongrel Boots engaged Inspireal to produce an informative walkthrough video of their brand new 30 station DESMA direct injection moulding machine. The new machine will replace their old 24 station machine after 15 loyal years of manufacturing in their Sydney factory.

Project Considerations:

  • Highlight Mongrel’s dedication to AUS manufacturing

  • Demonstrate the machine’s stages of production from start to finish

  • Highlight technology, robotics & automation of the machine

  • Two versions of long form to be delivered:

    • Public version (fit for general consumption across all applications & viewing methods)

    • Conference version (to support a presentation & promotion at the Independent Workwear Specialists [IWA] Trade Show)

Production Methods:

  • Utilise dialogue to educate the viewer about the production process

  • Avoid slow pacing & dated visual techniques

  • Slow shutter speed to make slow movements appear exaggerated

  • Timelapse to condense long tasks

  • Match cut logos in the factory as a substitute to a graphic overlay in post

Inspireal Films handled all aspects of production, including:

  • Liaising directly with the brand manager throughout pre & post production

  • Conceptualising a brief

  • Packaging various deliverable media assets

  • Half a day on location at the Mongrel Boots factory in Sydney, Australia

  • Capturing additional moments to build out the footage archive

  • Post-processing of all media

  • Raw footage supply with perpetual commercial licensing

  • Ensuring deliverables were timeless for future usage & display

Sequences were shot on Sony & DJI cameras, processed in Lightroom & LRTimelapse, compiled in After Effects to 4K UltraHD footage & finally; synchronised, sound designed & colour corrected in Adobe Premier Pro.

 

LOCATION: Mongrel Boots Factory - Sydney, Australia

Previous
Previous

BRIGHTSTAR

Next
Next

SYDNEY BOAT SHOW